Booster Pump Installation – London

This case study showcases a Booster Pump Installation in London delivered by Bigness Group’s mechanical services team. It covers a commercial pressure system upgrade using a FlowTech booster set, stainless-steel pipework, testing, commissioning and certification. The project demonstrates our ability to provide reliable water pressure for commercial plant rooms with minimal disruption, on time and on budget.

Project Overview

  • Client: Various (confidential)
  • Location: London
  • Sector: Commercial / Mechanical Services
  • Service Type: Booster Pump Installation & Pressure System Upgrade
  • Duration: 2 weeks
  • Completion Date: 03 March 2025

Project Objectives

  • Install a new booster pump system to stabilise water pressure across the facility.
  • Ensure reliable supply for commercial operations with minimal downtime.
  • Integrate FlowTech system for long-term durability and efficiency.

Scope of Works

  • Removal of obsolete pumping equipment.
  • Installation of FlowTech booster pump system with triple expansion vessels.
  • Stainless-steel pipework installation and pressure testing.
  • Integration with building water supply system and safety controls.
  • Commissioning and certification.

Challenges & Solutions

  • Challenge: Limited installation window to avoid disruption.
    Solution: Carried out staged works during off-peak hours to maintain water supply.

  • Challenge: Tight plant room space with existing services.
    Solution: Compact pump layout with precision pipework routing.

Results

  • Consistent water pressure achieved across the property.
  • Improved energy efficiency and reduced maintenance requirements.
  • Delivered safely, on time, and fully compliant with building regulations.

Client Testimonial

“Bigness upgraded our water system without disruption. The new FlowTech booster pumps perform perfectly, and the workmanship was excellent.” – Client

Key Takeaways

  • Modern booster pumps deliver reliable pressure in commercial facilities.
  • Staged installation minimises service disruption.
  • Energy-efficient systems reduce long-term operating costs.