Laboratory Fit-Out Project – London

Client: Confidential (Science & Research Facility)
Location: London
Sector: Science & Research / Healthcare
Service Type: Laboratory Design & Fit-Out | Design & Build | Cleanroom Construction
Duration: 14 Weeks
Completion Date: 2025

Project Overview

Bigness Group was appointed to deliver a full Laboratory Design and Build project in London, transforming a dated, non-compliant space into a modern, efficient science and research facility.
The scope included complete lab installation, HVAC upgrades, and fit-out of specialist equipment required for precision research and controlled-environment operations.

Our dedicated team of Lab Installation Specialists and Cleanroom Construction experts managed the entire process — from design concept to commissioning — ensuring compliance with strict safety, performance, and hygiene standards.

Project Objectives

  • Deliver a state-of-the-art Laboratory Fit-Out that supports modern research workflows.
  • Create a highly functional layout that optimises space, safety, and air quality.
  • Integrate specialist extraction, ventilation, and filtration systems.
  • Ensure full compliance with UK laboratory construction and safety standards.

Scope of Works

  • Demolition & Strip-Out: Removal of existing partitions, ceilings, and redundant M&E systems.

  • Structural & Fit-Out Works: Installation of partition walls, suspended ceilings, and hygienic cladding.

  • Mechanical & Electrical Services:

    • Laboratory-grade ventilation and extraction systems.
    • Upgraded power distribution and LED lighting.
    • Data, fire safety, and emergency systems integration.
  • Joinery & Finishes:

    • Custom laboratory benches and cabinetry.
    • Worktops with chemical-resistant surfaces.
    • Flooring with anti-slip and anti-static properties.
  • Equipment Integration:

    • Fume cupboards, autoclaves, and controlled temperature units.
    • Stainless-steel sinks and laboratory taps.
  • Testing & Commissioning:
    Airflow verification, lighting levels, and final compliance inspections.

Challenges & Solutions

Challenge 1 – Working in a Confined, Live Building:
The laboratory was part of an occupied multi-tenant facility.
Solution: Works were phased to minimise disruption, using noise control measures and after-hours scheduling.

Challenge 2 – Specialist HVAC & Extraction Requirements:
The existing system couldn’t meet the required air change rate.
Solution: Bigness engineers designed and installed a new HVAC system tailored to laboratory-grade air purity and fume control.

Challenge 3 – Structural Limitations:
Old infrastructure limited service routes for ducts and cables.
Solution: Innovative ceiling containment systems and concealed bulkheads were used to route M&E services efficiently.

Results

  • Delivered a fully operational, compliant laboratory environment ready for advanced research use.
  • Optimised space planning for better workflow and safety compliance.
  • Achieved full certification under local building and laboratory safety standards.
  • Transformed an ageing workspace into a high-performance scientific facility.

Key Outcomes

  • Demonstrated Bigness Group’s expertise in Laboratory Design and Build Services in London.
  • Established Bigness as trusted Lab Installation Specialists for science and healthcare projects.
  • Reinforced reputation in Lab & Cleanroom Construction with end-to-end project delivery.

Project Progress:

  • Strip-out and demolition phase showing initial framework and cabling.
  • Framing, ducting, and M&E installation under progress.
  • Preparation for ceiling systems, extraction ducts, and insulation works.

💬 Client Testimonial

“Bigness Group turned a challenging space into a professional-grade laboratory. Their attention to compliance, safety, and quality craftsmanship exceeded expectations.”

Sustainability & Safety

  • Use of energy-efficient LED lighting and low-VOC finishes.
  • Air handling units designed to reduce operational carbon footprint.
  • Adherence to Bigness Group’s Governance Framework and Health & Safety Code.

Why Choose Bigness Group

  • End-to-End Expertise: From design, build, and M&E integration to testing and certification.
  • Specialist Knowledge: Proven experience in Laboratory Design and Build Services in London.
  • Compliance-Driven Delivery: Meeting all UK laboratory, cleanroom, and safety standards.
  • Precision Craftsmanship: Skilled engineers and trades with scientific-grade attention to detail.
  • Client-Focused Approach: Transparent communication, on-time delivery, and long-term reliability.

Whether you’re upgrading a research suite or building a new facility, Bigness Group provides turnkey Laboratory Fit-Out solutions that combine safety, performance, and exceptional design.