Client: Confidential (Science & Research Facility)
Location: London
Sector: Science & Research / Healthcare
Service Type: Laboratory Design & Fit-Out | Design & Build | Cleanroom Construction
Duration: 14 Weeks
Completion Date: 2025
Project Overview
Bigness Group was appointed to deliver a full Laboratory Design and Build project in London, transforming a dated, non-compliant space into a modern, efficient science and research facility.
The scope included complete lab installation, HVAC upgrades, and fit-out of specialist equipment required for precision research and controlled-environment operations.
Our dedicated team of Lab Installation Specialists and Cleanroom Construction experts managed the entire process — from design concept to commissioning — ensuring compliance with strict safety, performance, and hygiene standards.
Project Objectives
- Deliver a state-of-the-art Laboratory Fit-Out that supports modern research workflows.
- Create a highly functional layout that optimises space, safety, and air quality.
- Integrate specialist extraction, ventilation, and filtration systems.
- Ensure full compliance with UK laboratory construction and safety standards.
Scope of Works
-
Demolition & Strip-Out: Removal of existing partitions, ceilings, and redundant M&E systems.
-
Structural & Fit-Out Works: Installation of partition walls, suspended ceilings, and hygienic cladding.
-
Mechanical & Electrical Services:
- Laboratory-grade ventilation and extraction systems.
- Upgraded power distribution and LED lighting.
- Data, fire safety, and emergency systems integration.
-
Joinery & Finishes:
- Custom laboratory benches and cabinetry.
- Worktops with chemical-resistant surfaces.
- Flooring with anti-slip and anti-static properties.
-
Equipment Integration:
- Fume cupboards, autoclaves, and controlled temperature units.
- Stainless-steel sinks and laboratory taps.
-
Testing & Commissioning:
Airflow verification, lighting levels, and final compliance inspections.
Challenges & Solutions
Challenge 1 – Working in a Confined, Live Building:
The laboratory was part of an occupied multi-tenant facility.
Solution: Works were phased to minimise disruption, using noise control measures and after-hours scheduling.
Challenge 2 – Specialist HVAC & Extraction Requirements:
The existing system couldn’t meet the required air change rate.
Solution: Bigness engineers designed and installed a new HVAC system tailored to laboratory-grade air purity and fume control.
Challenge 3 – Structural Limitations:
Old infrastructure limited service routes for ducts and cables.
Solution: Innovative ceiling containment systems and concealed bulkheads were used to route M&E services efficiently.
Results
- Delivered a fully operational, compliant laboratory environment ready for advanced research use.
- Optimised space planning for better workflow and safety compliance.
- Achieved full certification under local building and laboratory safety standards.
- Transformed an ageing workspace into a high-performance scientific facility.
Key Outcomes
- Demonstrated Bigness Group’s expertise in Laboratory Design and Build Services in London.
- Established Bigness as trusted Lab Installation Specialists for science and healthcare projects.
- Reinforced reputation in Lab & Cleanroom Construction with end-to-end project delivery.
Project Progress:
- Strip-out and demolition phase showing initial framework and cabling.
- Framing, ducting, and M&E installation under progress.
- Preparation for ceiling systems, extraction ducts, and insulation works.
💬 Client Testimonial
“Bigness Group turned a challenging space into a professional-grade laboratory. Their attention to compliance, safety, and quality craftsmanship exceeded expectations.”
Sustainability & Safety
- Use of energy-efficient LED lighting and low-VOC finishes.
- Air handling units designed to reduce operational carbon footprint.
- Adherence to Bigness Group’s Governance Framework and Health & Safety Code.
Why Choose Bigness Group
- End-to-End Expertise: From design, build, and M&E integration to testing and certification.
- Specialist Knowledge: Proven experience in Laboratory Design and Build Services in London.
- Compliance-Driven Delivery: Meeting all UK laboratory, cleanroom, and safety standards.
- Precision Craftsmanship: Skilled engineers and trades with scientific-grade attention to detail.
- Client-Focused Approach: Transparent communication, on-time delivery, and long-term reliability.
Whether you’re upgrading a research suite or building a new facility, Bigness Group provides turnkey Laboratory Fit-Out solutions that combine safety, performance, and exceptional design.























